This Post is Brought to You by Depends

We finally have a plumber in here to work on the house’s two original bathrooms, and when I say work on the bathrooms, I mean replace the cast iron plumbing stack that runs from down in the basement up through our second-story roof, plus pretty much every other original pipe. Because we’re doing the demo ourselves, DH ripped out the toilets last weekend meaning I need to run up a flight of 14 stairs if I need to pee.

And I do mean run, because I turn into a Zombie when I’m at the computer and when it hits me that I’ve been making a mental note to take a pee breakĀ  for, oh, two or three hours, time is of the essence.

Happily, the plumbers are here now. I was worried the water would be shut off while they are working on the bathrooms, leaving me no choice but to depend on Depends. (Or pee into a cup and then dump the contents into the skunk den under our front stoop, but I think it only scares them if the urine has a high testosterone content. Also, the skunks occupy the den during the day so this idea is really a worthless idea all around).

Fortunately, the plumbers are able to keep the water running in other areas of the house.

I am so glad we’ve finally started moving ahead on the bathroom renos. We have many of our new fixtures sitting in the living room and the others are on order. After the plumbing rough-in inspection later this week, the electrician will take center stage. DH, AKA the general contractor, “indulged” me by going tile hunting the other day, but I don’t think I was being premature. I really hope to have everything up and running by July.

Follow Reluctant Renovator on Facebook for the latest updates on skunks, chipmunks and all of the other wildlife trying to #OccupyMyYard.

Sorry, comments are closed for this post.